{"id":4093,"date":"2021-01-26T11:36:09","date_gmt":"2021-01-26T10:36:09","guid":{"rendered":"https:\/\/www.brainbox.consulting\/?p=4093"},"modified":"2021-02-04T10:06:16","modified_gmt":"2021-02-04T09:06:16","slug":"ariba-feature-release-2011-4","status":"publish","type":"post","link":"https:\/\/brainbox.consulting\/talent\/ariba-feature-release-2011-4\/","title":{"rendered":"Ariba Feature Release 2011\/4"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<h1>Support for multiple-line RFQs in Guided Buying<\/h1>\n<p>SAP Ariba introduced an extension to request for quote (RFQ) forms. It is now possible to request multiple lines within a single RFQ event. This eliminates the necessity to merge services &amp; goods together and\/or create multiple RFQ events when sourcing multiple line items.<\/p>\n<p>The current form remains available in Guided Buying for single line RFQs. In addition, SAP Ariba added a new form for multi-line RFQs. This can be added with JSON or through the UI as seen below (request form marked as \u201cnew\u201d).<\/p>\n<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4122 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-1-300x70.jpg\" alt=\"\" width=\"1003\" height=\"234\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-1-300x70.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-1-1024x240.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-1-768x180.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-1-1536x360.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-1.jpg 1849w\" sizes=\"(max-width: 1003px) 100vw, 1003px\" \/><\/strong><\/p>\n<p><strong>How to create a multi-line RFQ form?<\/strong><\/p>\n<p>The build-up of the form remains as is. Existing templates can also be used. A multi-line RFQ form consists of a main item (required) and up to 10 additional items. These additional items can be made either required or optional.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4120 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-2-300x290.jpg\" alt=\"\" width=\"601\" height=\"581\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-2-300x290.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-2-768x743.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-2.jpg 941w\" sizes=\"(max-width: 601px) 100vw, 601px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>When adding an additional item, a screen will be opened in which you need to provide a form template, item title, item description, select required or optional, commodity code, and item type. So within this screen you can add templates for forms with generic or commodity related questions, text fields or attachments that relate to the item that is being sourced.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4118 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-3-300x220.jpg\" alt=\"\" width=\"800\" height=\"587\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-3-300x220.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-3-1024x751.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-3-768x564.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-3.jpg 1232w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4116 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-4-300x219.jpg\" alt=\"\" width=\"801\" height=\"585\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-4-300x219.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-4-1024x747.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-4-768x560.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-4.jpg 1230w\" sizes=\"(max-width: 801px) 100vw, 801px\" \/><\/p>\n<p>Once the multi-line RFQ form is created, it will be visible in the UI as a tile. By clicking on the tile, the requester gains access to the form that was created in the previous steps.<\/p>\n<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4114 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-5-278x300.jpg\" alt=\"\" width=\"372\" height=\"401\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-5-278x300.jpg 278w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-5.jpg 383w\" sizes=\"(max-width: 372px) 100vw, 372px\" \/><\/strong><\/p>\n<p><strong>How to perform tactical sourcing events with multi-line RFQ forms?<\/strong><\/p>\n<p>The requester needs to fill out a number of details in order to post the RFQ:<\/p>\n<p>Header-level details:<\/p>\n<ol>\n<li>Title of the request: Market Research Bundle<\/li>\n<li>Ship-to location: Defaulted on Werk Hamburg<\/li>\n<li>Respond by date: deadline for suppliers to respond to the RFQ<\/li>\n<li>Estimated budget: Maximum amount that you anticipate to spend on the request (not shown to supplier)<\/li>\n<li>Purpose: short description (optional) (is shown to the supplier)<\/li>\n<\/ol>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4112 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-6-300x168.jpg\" alt=\"\" width=\"1000\" height=\"560\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-6-300x168.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-6-1024x573.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-6-768x430.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-6-1536x860.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-6.jpg 1547w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>Line-level details:<\/p>\n<ol>\n<li>Title (optional\/defaulted)<\/li>\n<li>Target price (use this pricing field to set a desired value. This will be the amount the supplier sees; suppliers can decide on going above or below this amount.)<\/li>\n<li>Custom\/Dynamic form fields, questions, and attachments (drawn from the template) (line-level)<\/li>\n<\/ol>\n<p><strong><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4110 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-7-300x194.jpg\" alt=\"\" width=\"1000\" height=\"647\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-7-300x194.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-7-1024x663.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-7-768x498.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-7.jpg 1386w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>Additional Line-level details: <\/strong><\/p>\n<ol>\n<li>Title (optional\/defaulted)<\/li>\n<li>Target price (use this pricing field to set a desired value. This will be the amount the supplier sees; suppliers can decide on going above or below this amount.)<\/li>\n<li>Duplicate (for required and optional items) (file with arrow icon, on the top-right)<\/li>\n<li>Delete (only for optional items) (trash-can icon, on the top right)<\/li>\n<\/ol>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4108 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-8-300x126.jpg\" alt=\"\" width=\"1000\" height=\"420\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-8-300x126.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-8-1024x431.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-8-768x323.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-8-1536x647.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-8.jpg 1539w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4106 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-9-300x125.jpg\" alt=\"\" width=\"1003\" height=\"418\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-9-300x125.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-9-1024x427.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-9-768x321.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-9-1536x641.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-9.jpg 1543w\" sizes=\"(max-width: 1003px) 100vw, 1003px\" \/><\/p>\n<p>Once all the mandatory fields are filled, the multi-line RFQ form is completed. Requesters are now able to click next and can navigate to the second screen. Within this view, the requester selects one or more suppliers based on personal preference or based on business rules.<\/p>\n<p>Suppliers need to be qualified and\/or preferred for the same commodity\/region combination as the form before they will be visible to the requester. When a supplier is qualified for all the selected line-items, there is a 100% match. However, if a supplier is only qualified for one out of the three line-items, there is just a 33% match. Although MGKP Services is only matching with one of the qualified commodities, the supplier is still able to submit a bid for all the line-items that are part of the tactical sourcing event. However, it should be noted that this may result in a compliance issue within some organizations.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4104 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-10-300x140.jpg\" alt=\"\" width=\"1001\" height=\"467\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-10-300x140.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-10-1024x479.jpg 1024w\" sizes=\"(max-width: 1001px) 100vw, 1001px\" \/><\/p>\n<p>For this RFQ scenario we will select two preferred suppliers which are both qualified for 3\/3 line-items. Thus, these vendors have a 100% match with the request for quote form that we filled.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4102 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-11-300x172.jpg\" alt=\"\" width=\"1001\" height=\"574\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-11-300x172.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-11-1024x588.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-11-768x441.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-11-1536x882.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-11.jpg 1547w\" sizes=\"(max-width: 1001px) 100vw, 1001px\" \/><\/p>\n<p>When the requester has submitted the forms the quote requests will be send to the supplier. This is dependent on the sourcing scenario that is enforced. This scenario is self-service (no-touch), meaning that there is no involvement or approval from the sourcing\/procurement department required. Also, the target price and the estimated budget are displayed within this screen.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4100 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-12-300x158.jpg\" alt=\"\" width=\"1001\" height=\"527\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-12-300x158.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-12-1024x538.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-12-768x404.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-12-1536x807.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-12.jpg 1539w\" sizes=\"(max-width: 1001px) 100vw, 1001px\" \/><\/p>\n<p>Apart from the header details there is also a section that specifies the information related to line-items. Below you can see that the RFQ is split up into three different line-items, which are all priced, and treated independently within the tactical sourcing event.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4098 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-13-300x128.jpg\" alt=\"\" width=\"1003\" height=\"428\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-13-300x128.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-13-1024x437.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-13-768x328.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-13.jpg 1536w\" sizes=\"(max-width: 1003px) 100vw, 1003px\" \/><\/p>\n<p>Supplier Perspective:<\/p>\n<p>Once the supplier intents to participate he\/she can select the lots that they want to place a bid for. To have the best chance on getting selected for the tender, the supplier needs select all the line-items.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4096 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-14-300x113.jpg\" alt=\"\" width=\"1001\" height=\"377\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-14-300x113.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-14-1024x385.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-14-768x289.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-14-1536x578.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-14.jpg 1666w\" sizes=\"(max-width: 1001px) 100vw, 1001px\" \/><\/p>\n<p>After having the lots selected, the supplier can provide their pricing per line-item:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4094 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-15-300x104.jpg\" alt=\"\" width=\"1001\" height=\"347\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-15-300x104.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-15-1024x356.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-15-768x267.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-15-1536x534.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-15.jpg 1675w\" sizes=\"(max-width: 1001px) 100vw, 1001px\" \/><\/p>\n<p>Then, the supplier needs to submit their bids. These will be sent to the buyer in Guided Buying. From Guided Buying, the requester is able to click on the RFQ event to access the information that the suppliers sent.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4136 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-16-300x235.jpg\" alt=\"\" width=\"400\" height=\"313\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-16-300x235.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-16.jpg 541w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<p>Within the RFQ event, the requester has access to all the information that the supplier sent such as price, attachments, comments, and other terms. To award a supplier, the requester needs to select \u201caccept quote\u201d. It is not possible to purchase line-items across multiple vendors. To achieve this, separate RFQs need to be created where the line-items can be sourced separately from multiple vendors. For multi-line RFQ events, there is only one vendor that is awarded with the lot(s), even if this supplier did not select all lots and is not able to deliver all the line-items in the event. In that case, the line item is not included in the bid and will not be sourced. A separate RFQ event can be set up to source the remaining item(s).<\/p>\n<p>Header level details:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4134 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-17-300x106.jpg\" alt=\"\" width=\"1002\" height=\"354\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-17-300x106.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-17-1024x361.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-17-768x271.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-17-1536x541.jpg 1536w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-17.jpg 1736w\" sizes=\"(max-width: 1002px) 100vw, 1002px\" \/><\/p>\n<p>Item level details (left = Terra Advisory, right = MGKP Services):<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4132 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-18-300x292.jpg\" alt=\"\" width=\"799\" height=\"778\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-18-300x292.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-18-768x747.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-18.jpg 928w\" sizes=\"(max-width: 799px) 100vw, 799px\" \/><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4130 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-19-300x289.jpg\" alt=\"\" width=\"799\" height=\"770\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-19-300x289.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-19-768x739.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-19.jpg 945w\" sizes=\"(max-width: 799px) 100vw, 799px\" \/><\/p>\n<p>The supplier on the left (MGKP Services) does not perform Telemarketing Services and was not able to select the lot for it. Awarding the bid to MGKP Services, the requester chooses to cancel the acquisition of telemarketing services.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4128 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-20-300x288.jpg\" alt=\"\" width=\"799\" height=\"767\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-20-300x288.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-20-768x738.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-20.jpg 937w\" sizes=\"(max-width: 799px) 100vw, 799px\" \/><\/p>\n<p>Once the requester has accepted the bid, the RFQ is flipped into a requisition with 3 line-items.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4126 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-21-300x215.jpg\" alt=\"\" width=\"801\" height=\"574\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-21-300x215.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-21-1024x732.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-21-768x549.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-21.jpg 1239w\" sizes=\"(max-width: 801px) 100vw, 801px\" \/><\/p>\n<p>After the requisition passed all approvers, the purchase order is created and sent to the supplier.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-4124 aligncenter\" src=\"https:\/\/www.brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-22-300x53.jpg\" alt=\"\" width=\"1002\" height=\"177\" srcset=\"https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-22-300x53.jpg 300w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-22-1024x181.jpg 1024w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-22-768x136.jpg 768w, https:\/\/brainbox.consulting\/talent\/wp-content\/uploads\/2021\/01\/2011-4-22.jpg 1243w\" sizes=\"(max-width: 1002px) 100vw, 1002px\" \/>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"gem-button-container gem-button-position-center\"><a class=\"gem-button gem-button-size-large gem-button-style-flat gem-button-text-weight-normal\" style=\"border-radius: 3px;background-color: #848484;color: #ffffff;\" onmouseleave=\"this.style.backgroundColor='#848484';this.style.color='#ffffff';\" onmouseenter=\"this.style.backgroundColor='#ea8725';this.style.color='#ffffff';\" href=\"https:\/\/www.linkedin.com\/smart-links\/AQERiqrakgl9KQ\/603950d5-f2b1-4b10-be39-d20e335f8c53\" target=\"_self\">Find Out More!<\/a><\/div> [\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Support for multiple-line RFQs in Guided Buying SAP Ariba introduced an extension to request for quote (RFQ) forms. It&#8230;<\/p>\n","protected":false},"author":8,"featured_media":2894,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false},"categories":[21],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/posts\/4093"}],"collection":[{"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/comments?post=4093"}],"version-history":[{"count":6,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/posts\/4093\/revisions"}],"predecessor-version":[{"id":4177,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/posts\/4093\/revisions\/4177"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/media\/2894"}],"wp:attachment":[{"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/media?parent=4093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/categories?post=4093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brainbox.consulting\/talent\/wp-json\/wp\/v2\/tags?post=4093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}